Frontpage    Contact    Print    Sitemap    Search

LORC tests and demonstrates technology for harvesting renewable energy offshore

Latest News

 

14 May 2014: Visit LORC Nacelle Testing with the conference 'Test & Verification for subcontractors in the Wind Turbine Generator Industry'

 

Watch short videos of the construction of LORC Nacelle Testing: Installation of 80-tonnes heavy stator

 

The high voltage supply for LORC Nacelle Testing is being prepared with the Construction of a new local substation ensuring a 33 kV supply for the offshore Wind turbine test centre. Read the LORC Newsletter at this link.

Sitemap

Copyright and rights © 2010
Disclaimer